Project Final Reports
•
A Methodological Framework for Modeling Auto-Commuter Rail Intermodal Networks
(Final Report.PDF)
(Final Report.htm)
•
A Methodological Framework for Optimizing Bus Transit Service Coverage
(Final Report.PDF)
(Final Report.htm)
•
A Model for Scheduling Tractors and Trailers in Rail Truck Intermodal Transport
(Final Report.PDF)
(Final Report.htm)
•
Air Quality Monitoring Computer Systems
(Final Report.PDF)
(Final Report.htm)
•
Alternate Performance Measures for Evaluating Congestion
(Final Report.PDF)
(Final Report.htm)
•
Alternative Performance Measures for Evaluating Congestion - Congestion Analysis Model Update and Maintenance
(Final Report.PDF)
(Final Report.htm)
•
Analysis and Evaluation of Intermodal Commuter Corridors in New Jersey
(Final Report.PDF)
(Final Report.htm)
•
Analysis and Modeling of Cape May County Roadway Elevations and Evacuation Routes
(Final Report.PDF)
(Final Report.htm)
•
Analysis of Accident Reports of Trucks in Work Zones
(Final Report.PDF)
(Final Report.htm)
•
Assess Impacts and Potential Benefits of Traffic Signal Priority for Buses
(Final Report.PDF)
(Final Report.htm)
•
Cape May County Hurricane Evacuation and Elevation Study Extension
(Final Report.PDF)
(Final Report.htm)
•
Cause and Control of Transverse Cracking in Concrete Bridge Decks - Year I
(Final Report.PDF)
(Final Report.htm)
•
Cause and Control of Transverse Cracking in Concrete Bridge Decks - Year II
(Final Report.PDF)
(Final Report.htm)
•
Combination Glare Screen Pedestrian Fence for Center Barrier
(Final Report.PDF)
•
Communication and Productivity - Analysis of NJDOT Research
(Final Report.PDF)
(Final Report.htm)
•
Computer Modeling and Simulation of New Jersey Signalized Highways
(Final Report.PDF)
(Final Report.htm)
•
Computer Modeling and Simulation of NJ Transit Penn Station Newark
(Final Report.PDF)
(Final Report.htm)
•
Container Port Operations - Phase I: Straddle Carrier Decision Algorithm Optimization
(Final Report.PDF)
(Final Report.htm)
•
Contamination Arresting Systems
(Final Report.PDF)
(Final Report.htm)
•
Correlation of Surface Texture, Segregation, and Measurement of Air Voids
(Final Report.PDF)
(Final Report.htm)
•
Cost Benefit Analysis Modification to Project 2001-01, Computer Modeling and Simulation of New Jersey Signalized Highway
(Final Report.PDF)
(Final Report.htm)
•
Cutomer Behavior Relative to Gap Between Platform and Train
(Final Report.PDF)
(Final Report.htm)
•
Data Research - Materials Laboratory Information System (LIMS) - Year I
(Final Report.PDF)
(Final Report.htm)
•
Data Research - Materials Laboratory Information System (LIMS) - Year II - Computerized Materials Laboratory Information Management Systems
(Final Report.PDF)
(Final Report.htm)
•
Design and Evaluation of Toll Plaza Systems
(Final Report.PDF)
(Final Report.htm)
•
Developing a Freight Data Executive for MIS for New Jersey Using Hypertext
(Final Report.PDF)
(Final Report.htm)
•
Developing a Market Sensitive ITS Educational Program
(Final Report.PDF)
(Final Report.htm)
•
Developing an Integrated Congestion Pricing and Traveler Information System - Phase I: The Individual System
(Final Report.PDF)
(Final Report.htm)
•
Development of a Simulation / Assignment Model for an ITS Priority Corridor
(Final Report.PDF)
(Final Report.htm)
•
Digital Map Requirements for Automatic Vehicle Location
(Final Report.PDF)
(Final Report.htm)
•
Effectiveness of Bus Nubs for Bus Stops
(Final Report.PDF)
(Final Report.htm)
•
Effectiveness of Certain Design Solutions on Reducing Vehicle Speeds
(Final Report.PDF)
(Final Report.htm)
•
Establishing Safe Driveway Grades for NJ State Highways
(Final Report.PDF)
(Final Report.htm)
•
E-stations for Newark -- Phase 1
(Final Report.PDF)
•
Estimation and Prediction of National and Regional Sectoral Freight Flows in the United States: An Analysis from Origin to Destination by Modality of Transportation
(Final Report.PDF)
(Final Report.htm)
•
Estimation of Freight Flow: Data Analysis and Gravity Modeling - Phase II:Developing a Freight Model to Forecast Truck Flow Between New Jersey Counties and Between New Jersey and Other States
(Final Report.PDF)
(Final Report.htm)
•
Estimation of Truck Volumes and Flows
(Final Report.PDF)
(Final Report.htm)
•
Evaluation of Design Ideas for Prevention of Vehicles Entrapment on Railroad Tracks
(Final Report.PDF)
(Final Report.htm)
•
Evaluation of the Potential for Using Ramp Metering in the ATMS of the I-80 Showcase Corridor
(Final Report.PDF)
•
External Validity Test for Discrete Choice Transportation Forecasting Models Based on Stated Choice Approach
(Final Report.PDF)
(Final Report.htm)
•
Fatigue Management, Rail Operations Personnel
(Final Report.PDF)
(Final Report.htm)
•
Fault-Tolerant Traffic Control Systems
(Final Report.PDF)
(Final Report.htm)
•
Feasibility Analysis Study and Conceptual Development Plan for Morris County at Picatinny Arsenal
(Final Report.PDF)
(Final Report.htm)
•
Freight Planning Support System For Northern New Jersey
(Final Report.PDF)
(Final Report.htm)
•
Garden State Parkway Toll Plaza Removal
(Final Report.PDF)
(Final Report.htm)
•
Gender and Professional Worklife at State DOTs: A Pilot Study
(Final Report.PDF)
(Final Report.htm)
•
Good Neighbor Privacy Fence
(Final Report.PDF)
•
Heuristic Search Strategies to Solve Discrete Transportation Network Design Problems
(Final Report.PDF)
(Final Report.htm)
•
Highway Advisary Radio (HAR) Systems
(Final Report.PDF)
(Final Report.htm)
•
Hudson Bergen Light Rail Customer Impact and Retention Study
(Final Report.PDF)
•
Identifying Factors and Mitigation Technologies in Truck Accidents in New Jersey.
(Final Report.PDF)
(Final Report.htm)
•
Impact of Access Driveways on Accident Rates on Multilane Highways
(Final Report.PDF)
(Final Report.htm)
•
Implementation of Concrete Maturity Meter
(Final Report.PDF)
(Final Report.htm)
•
Implementation of Recommended LRFD Guidelines for Seismic Design of Highway Bridges in NJ
(Final Report.PDF)
(Final Report.htm)
•
Improvement of Continuity Connections Over Fixed Piers
(Final Report.PDF)
(Final Report.htm)
•
Improving Public Transit Schedules, Timetables People Can Actually Read
(Final Report.PDF)
(Final Report.htm)
•
Improving the Capabilities of Existing Transportation Planning Packages
(Final Report.PDF)
(Final Report.htm)
•
Integrated Signals - A Cost Benefits Analysis for the New Jersey Department of Transportation
(Final Report.PDF)
(Final Report.htm)
•
Ironbound Research Project
(Final Report.PDF)
•
Maturity Method in Prestressed Concrete Applications
(Final Report.PDF)
•
Medical Review Case Reporting at MVC
(Final Report.PDF)
•
Mobility and the Costs of Congestion in New Jersey
(Final Report.PDF)
(Final Report.htm)
•
Mobility and the Costs of Congestion in New Jersey - Update 2001
(Final Report.PDF)
(Final Report.htm)
•
Mobility Information Needs of Limited English Proficiency People In NJ
(Final Report.PDF)
(Final Report.htm)
•
Motorized Scooters / Go-Peds
(Final Report.PDF)
(Final Report.htm)
•
Moving Telecommuting Forward: An Examination of Organizational Variables
(Final Report.PDF)
(Final Report.htm)
•
Multi-Modal Freight Transportation: Regional Data Development and Analysis, Task 5-7
(Final Report.PDF)
(Final Report.htm)
•
New Jersey Alliance for Action 2020 Infrastructure Study
(Final Report.PDF)
(Final Report.htm)
•
Optimization of Very Early Strength Concrete
(Final Report.PDF)
(Final Report.htm)
•
Parking Management and Architectural Development Strategy
(Final Report.PDF)
•
Pedestrian Safety and Mobility Aids for Crossings and Access to Bus Stops
(Final Report.PDF)
(Final Report.htm)
•
Policies for Real-time Vehicle Routing
(Final Report.PDF)
(Final Report.htm)
•
Project Management & Progress Tracking System (ProMPTS) - Maintenance and Improvement Contract + Extension: MOD1 + MOD2
(Final Report.PDF)
(Final Report.htm)
•
Project Management Enhancement/CPM Project Tracking System
(Final Report.PDF)
(Final Report.htm)
•
Rail Intermodal Service Planning: A Review of Optimization Models
(Final Report.PDF)
(Final Report.htm)
•
Research Project Maintenance & Monitoring System (Original Project + Extension: MOD1 and MOD2)
(Final Report.PDF)
(Final Report.htm)
•
Research Project Maintenance and Monitoring System (Original Project)
(Final Report.PDF)
(Final Report.htm)
•
Salt Runoff Collection Systems
(Final Report.PDF)
•
Seismic Retrofitting & Design of Highway Bridges in New Jersey - Phase II
(Final Report.PDF)
(Final Report.htm)
•
Sensitivity Analysis of the New FHWA Sketch Planning Analysis Spread Sheet Model (SPASM)
(Final Report.PDF)
(Final Report.htm)
•
Shoulder Rumble Strips and Bicyclists
(Final Report.PDF)
(Final Report.htm)
•
South Jersey Real-Time Motorist Information System
(Final Report.PDF)
(Final Report.htm)
•
Stability and Accuracy of HCM Level of Service in Darkness and Adverse Weather
(Final Report.PDF)
(Final Report.htm)
•
Study of Optimal Travel Speed Limits for Shared Traffic
(Final Report.PDF)
(Final Report.htm)
•
Study to Determine the Need for Innovative Concept of Container Transportation System
(Final Report.PDF)
(Final Report.htm)
•
Survey of Driver Perceptions of Railroad and Light Rail Warning Devices/Grade Crossings Year II
(Final Report.PDF)
(Final Report.htm)
•
Survey of Transit/Rail Freight Interactions
(Final Report.PDF)
(Final Report.htm)
•
Technology Transfer (Lockheed Martin)
(Final Report.PDF)
(Final Report.htm)
•
The Freight Analysis Framework Pilot Project
(Final Report.PDF)
(Final Report.htm)
•
The Future of Transportation Planning
(Final Report.PDF)
(Final Report.htm)
•
The Mature Driver:Safety and Mobility Issues
(Final Report.PDF)
(Final Report.htm)
•
The Transportation Economic and Land Use System (TELUS) 1.0
(Final Report.PDF)
(Final Report.htm)
•
The Transportation Economic and Land Use System (TELUS) 2.0
(Final Report.PDF)
(Final Report.htm)
•
The Uses of State DOT Research: Customer Use of Completed Projects from NJDOT Bureau of Research
(Final Report.PDF)
(Final Report.htm)
•
To Advance the Concept of the Aesthetic Design of Noise Barrier Walls Through the Detailed Design of Models, Prototypes and Plans and Specification of the Bhavnani Design
(Final Report.PDF)
(Final Report.htm)
•
Use of Neural Network / Dynamic Learning Algorithms to Predict Bus Travel Times Under Congestion Conditions
(Final Report.PDF)
(Final Report.htm)
•
Water Level Prediction for Transportation Projects - Year I
(Final Report.PDF)
(Final Report.htm)
•
Water Level Prediction for Transportation Projects - Year II
(Final Report.PDF)
(Final Report.htm)
NCTIP webmaster:
hu@njit.edu